Swift Engineering

San Clemente, CA (2013)

The project modified an existing building for the installation of two industrial autoclaves. A concrete pit and exterior covered equipment yard was created to house a 40′ industrial autoclave. Building infrastructure was modified to provide mechanical and electrical systems for the autoclave.

A second project installed a carbon-fiber molding industrial clean room in the remaining area of the building. 

EDIT_DSC_9115.jpg
EDIT_DSC_9112.jpg
EDIT_DSC_9105.jpg